Planned electric transmission (HIFLD/NETL + ERCOT)
What it is
48 planned electric transmission lines, combining nationwide HIFLD/NETL data with ERCOT in Texas (FUENTE_RED), with name (NOMBRE), project status (ESTADO: under construction, planned, proposed, 97.92%), voltage (VOLT_CLASS, with the source formatting inconsistency ‘354kv’/‘354kV’), owner (PROPIETARIO: Ohio Power, AEP, ONCOR…) and expected in-service year (EN_SERVICIO, with gaps). HIFLD Open shut down in August 2025 and this data comes from mirrors of the original service.
The upstream service publishes no abstract for this layer.
At a glance
| ID | us_red_electrica_transmision_planificada |
| Records | 48 |
| Size | 0.0 MB |
| Geometry | LINESTRING, MULTILINESTRING |
| CRS | EPSG:4326 |
| Version | v/2026-09 |
| Source | hifld |
| Upstream layer | hifld:Planned_Transmission_Lines_NETL_ERCOT |
| Licence | Dominio público («U.S. Government Works»; «public domain information» según EIA) |
Extent: -116.64185, 26.08612 → -76.63047, 49.00307
Download
curl -H "x-api-key: $GEOVIS_API_KEY" \ https://datos.geovis.es/v1/data/datasets/us_red_electrica_transmision_planificada/downloadsha256 of this version:
f943e5b6c548800e2e15ef424054acd079f0429fb3febec892e45bbe64f2cfddQuery it without downloading it
import duckdbcon = duckdb.connect(); con.execute("INSTALL spatial; LOAD spatial; INSTALL httpfs; LOAD httpfs;")con.execute("SELECT count(*) FROM read_parquet('<url-firmada>')").fetchone()Columns
Column names are kept exactly as the agency publishes them. They are not translated: renaming them would break traceability against the official source.
The literals below are the ones present in the data: they work as-is in a WHERE. Only columns with few distinct values are enumerated; for the rest, the count is given.
| Column | Type | Filled | Distinct | Values |
|---|---|---|---|---|
NOMBRE | VARCHAR | 100 % | 47 | |
ESTADO | VARCHAR | 97.92 % | 3 | En construcción · Planificada · Propuesta |
VOLT_CLASS | VARCHAR | 100 % | 8 | 354kv · UNDER 100 · 100-161 · 138kV · 345 · 354kV · 500 · NOT AVAILABLE |
PROPIETARIO | VARCHAR | 100 % | 12 | OHIO POWER CO · AEP · NOT AVAILABLE · ONCOR · AEP TCC · LRCA · BALTIMORE GAS & ELECTRIC C · CenterPoint |
FUENTE_RED | VARCHAR | 100 % | 2 | HIFLD/NETL (nacional) · ERCOT (Texas) |
EN_SERVICIO | VARCHAR | 100 % | 7 | “ · 2027 · 2025 · 2024 · 2026 · 2022 · 2023 |
_fuente | VARCHAR | 100 % | 1 | hifld |
_fecha_captura | DATE | 100 % | 1 | 2026-09-12 |
_fecha_edicion | DATE | 0 % | — | |
_licencia | VARCHAR | 100 % | 1 | Dominio público («U.S. Gov |
_atribucion | VARCHAR | 100 % | 1 | Homeland Infrastructure Fo |
bbox | STRUCT(xmin DOUBLE, ymin DOUBLE, xmax DOUBLE, ymax DOUBLE) | 100 % | — | |
geometry | GEOMETRY(‘EPSG:4326’) | 100 % | — |