Docs
Contents

National Interest Electric Transmission Corridors (NIETC)

What it is

The 3 potential National Interest Electric Transmission Corridors (NIETC Phase 3, Dec 2024) proposed by DOE/Argonne: Lake Erie - Canada Connector, Southwestern Grid Connector and Tribal Energy Access, with their area in acres (AreaAcres). Being only 3, very large polygons, the viewer renders them from zoom level 2.

The upstream service publishes no abstract for this layer.

At a glance

IDus_red_electrica_nietc
Records3
Size0.0 MB
GeometryPOLYGON
CRSEPSG:4326
Versionv/2026-09
Sourcedoe_gdo
Upstream layerdoe:Potential_NIETCs_Phase3
LicenceDominio público (Web Policies de energy.gov)

Extent: -106.14129, 32.12384 → -79.98145, 46.41264

Download

curl -H "x-api-key: $GEOVIS_API_KEY" \
https://datos.geovis.es/v1/data/datasets/us_red_electrica_nietc/download

sha256 of this version:

3b97bfdd81878f2e8634f17b3725621319bd9db4d57f6240f63d535af6aed2db

Query it without downloading it

import duckdb
con = duckdb.connect(); con.execute("INSTALL spatial; LOAD spatial; INSTALL httpfs; LOAD httpfs;")
con.execute("SELECT count(*) FROM read_parquet('<url-firmada>')").fetchone()

Columns

Column names are kept exactly as the agency publishes them. They are not translated: renaming them would break traceability against the official source.

The literals below are the ones present in the data: they work as-is in a WHERE. Only columns with few distinct values are enumerated; for the rest, the count is given.

ColumnTypeFilledDistinctValues
NameVARCHAR100 %3Lake Erie - Canada Connect · Southwestern Grid Connecto · Tribal Energy Access
PhaseVARCHAR100 %1Phase 3 - Press Release -
AreaAcresDOUBLE100 %31126821.1937131225 · 41874.47754699762 · 652164.4937795261
_fuenteVARCHAR100 %1doe_gdo
_fecha_capturaDATE100 %12026-09-12
_fecha_edicionDATE0 %—
_licenciaVARCHAR100 %1Dominio público (Web Polic
_atribucionVARCHAR100 %1U.S. Department of Energy,
bboxSTRUCT(xmin DOUBLE, ymin DOUBLE, xmax DOUBLE, ymax DOUBLE)100 %—
geometryGEOMETRY(‘EPSG:4326’)100 %—